
High Grade American Silver Production Starts Now - Aurcana Silver
Akash Vyas
Description
<p>Kevin Drover CEO and President of our <em>sponsor</em> Aurcana Silver came by for an update on the high-grade Revenue Virginius mine. Last year he assured us that silver production would commence summer of 2021 and he’s about to deliver.<span class= "Apple-converted-space"> </span></p> <p>Kevin is a no hype leader who does everything in his power to deliver, pandemic or not. He’s so committed that he moved to Colorado to personally oversee the mine’s opening. And it worked. Metal should be going through the mill later this month. The first concentrate will be produced by August.<span class= "Apple-converted-space"> </span></p> <p>The best news yet, the ore from the first cross-cut is even richer than anticipated. While 36 oz per ton was expected, they got 39 oz. per ton<span class="Apple-converted-space"> </span> The vein width was thought to be 1.6 feet, but the first cut was 2.5 foot. Full mill capacity of 270 tons per day should happen in September, along with the resulting positive cash flow. And then it’s on to the Texas Shafter Mine and once that starts production in a couple of year, all bets are off. (We own shares in Aurcana)</p> <p>Go to <a href="http://Aurcana.com">Aurcana.com</a> to get the latest updates. Ticker symbol on the AUN for Canadians and for US investors it’sl AUNFF.<span class= "Apple-converted-space"> </span></p>
Uploader
Episodes
High Grade American Silver Production Starts Now - Aurcana Silver
Akash Vyas