Episode 23: A 27-Day ILI Run; A Case Study of a Low-Pressure, Low Flow Line with Denise Earles
Episode 23: A 27-Day ILI Run; A Case Study of a Low-Pressure, Low Flow Line with Denise Earles

Episode 23: A 27-Day ILI Run; A Case Study of a Low-Pressure, Low Flow Line with Denise Earles

Dame gnahore

25 min
Knowledge
Play

Description

<p><span style="font-weight: 400;">This month’s Pipeline Technology Podcast episode sponsored by Pipeline & Gas Journal features Denise Earles of Pipesurvey USA discussing her company’s 27-day-long ILI run and how they worked through low pressure and low flow obstacles to produce accurate results.</span></p> <p><span style="font-weight: 400;">In this month’s episode, you will learn why the run took 27 days and how low pressure and low flow caused other issues, such as paraffin buildup and having to calculate the batteries for the ILI tool to run properly over that long period of time.</span></p> <p><span style="font-weight: 400;">- Access the show notes and full episode transcript at PipelinePodcastNetwork.com.</span></p>

Uploader

neal_song

neal_song

Episode 23: A 27-Day ILI Run; A Case Study of a Low-Pressure, Low Flow Line with Denise Earles - Listen Free | WowFM